Timber & Structural Steel · Victoria · Australia-wide

We own the
whole structure.

Timber and steel — engineered, manufactured and delivered by one team. So the gaps between suppliers stop becoming your problem.

Hero photograph

Exposed structure at frame stage — trusses up, steel posts in, light coming through. Shot from inside, looking up. No people in hi-vis posing. This is the shot that says “we made this.”

20+ yrs

Supporting Australian builders

80+

People on our team

Timber + Steel

Both, from one team

Family owned

Same people, every job

The problem

Structural problems don’t happen inside the package. They happen between packages.

Between the engineer’s drawing and the shop drawing. Between the timber and the steel. Between the delivery docket and the crane booking. Nobody owns those gaps — so they land on you.

01

The beam that doesn’t land

The steel was fabricated off one revision. The trusses were made off another. Somebody has to cut something on site, and it won’t be the supplier standing there.

02

The crane with nothing to lift

Two suppliers, two schedules, one crane day. When the sequence slips, the machine sits idle and the cost is yours, not theirs.

03

The phone call nobody answers

The frame mob blames the steel mob. The steel mob blames the engineer. You’re the one standing in the mud, three weeks off lockup, holding it together.

When one team makes the timber and the steel, there’s nobody left to blame. That’s the point.

How we work

The best structural solutions start with understanding.

Most suppliers price a drawing. We ask what you’re actually trying to build — because we’re the ones who have to make it all line up.

01

Understand the job

Programme, methodology, site access, sequence, design intent, budget. Not just the plans — the project around them.

02

Engineer the answer

We work out the right structural approach. Sometimes that’s more steel. Sometimes it’s less. We’ll tell you which, and why.

03

Build it right

Timber and steel, in our own factories, by our own people, off one coordinated set of drawings.

04

Land it on site

Sequenced to your programme, delivered in the order you’ll build it, with one number to call if anything moves.

Capabilities

Tools we use to solve the problem — not a catalogue.

Integrated timber and steel

The capability nobody else in the conversation has. One team designs the timber, fabricates the steel, and owns the junction where they meet. It’s the joint that costs builders the most money — and the one we take responsibility for.

Roof trusses

Designed to your roof, not to a template. Complex geometry, long spans, awkward junctions — the ones other shops quote high to avoid.

Timber wall frames

Precision-manufactured, marked up and stacked in build order, so your carpenters aren’t sorting a pile before they can start.

Floor systems

Cassettes and joist systems engineered for span, service runs and the reality of how the trades will actually work above and below.

Structural steel

Beams, columns, portal frames and connections — fabricated in-house for residential, commercial and industrial work.

A better way to build it

Not “value engineering” — we don’t cheapen your spec. We find the way to build it that costs you less on site, and we show you the maths.

Project coordination

One coordinator from first conversation to final delivery. They know your job. You won’t be explaining it again.

Who we work with

Different sectors. Same kind of builder.

Residential

Custom & volume

Multi-residential

Townhouses & apartments

Commercial

Coordinated trades

Industrial

Steel-led structures

Architectural

Complex geometry

The sector changes. The builder doesn’t. They plan ahead, they expect a phone call before a problem lands on site, and they’d rather have the right answer than the fastest one.

We’re not the supplier for every builder.

If the lowest number on the day is the only thing that matters, there are cheaper suppliers than us — and we’ll tell you so. We’re built for builders who count the cost of the whole job, not the price of the package.

Why Glencoe

Twenty years is not a reason. Here’s the reason.

Plenty of suppliers have been around a long time. What matters is whether the structure turns up right, on the day you need it, and who picks up the phone when it doesn’t.

20+

Years supporting Australian builders. Victorian family business, national capability.

80+

People on the team. The same coordinator, engineer and driver on your job.

Timber + Steel

Both manufactured in-house. One drawing set. One point of accountability.

Proof slot

On-time, in-full delivery rate. The single most persuasive number you can publish. Measure it, publish it, update it monthly. Nothing else on this page works as hard.

Portrait

The builder who gave this quote. On their site, not in an office. Named. Face visible. Company logo can sit in the corner.

In their words

“[Named builder quote goes here — and it must contain a fact, not a compliment. Ask them: what was the hard part of that job, and is there a day you remember us actually saving you something?]”

[Name], [Role]

[Builder company name] · [Project name]

Note: Four of these, named and photographed. An anonymous testimonial is read as fiction by builders — and they’re usually right.

Selected projects

Six jobs. Six problems. Six numbers.

Not a gallery. Every one of these is a problem we were handed and what it saved the builder to solve it properly.

01

Architectural · Complex geometry

The roof that three truss shops wouldn’t touch

Challenge
A cathedral ceiling over an open living space, with exposed steel carrying a mezzanine above it. Three suppliers priced the timber and the steel separately. None would own the junction.

What we did
We detailed the trusses and the steel off the same revision, redesigned the connection so it could be lifted as one assembly, and pre-fitted the plates in the shop.

[X] days

saved on site — one crane day instead of three, no on-site fabrication

02

Volume residential

A delivery rhythm the site could actually build to

Challenge
A volume builder running [X] starts a month was losing days at frame stage — deliveries arriving as a pile, chippies sorting instead of building.

What we did
We changed how we load. Frames marked and stacked in build sequence, delivered to a rolling schedule matched to their crew rotation, not our factory run.

[X] days

off the average frame-to-lockup cycle across [X] homes

03

Multi-residential

Nowhere to put a load, and a crane for one day

Challenge
A townhouse development with a site so tight there was no laydown area. A full delivery would have blocked the only access.

What we did
Staged deliveries, sequenced unit by unit, timed to the crane. Steel and timber arrived in the order they went up.

[X]

deliveries staged across [X] weeks — zero site shutdowns, zero double-handling

Tell us what you’re building.

Not “send us the drawings.” Tell us about the job — the programme, the site, the part that’s giving you grief. We’ll tell you how we’d approach it. If we’re not the right fit, we’ll say that too.